FIELD SERVICES

Field Replace Bearing :- Remove motor from base plate, Electrical check, Replace bearing, Motor re-install, Shaft laser alignment, Motor on-load and on-load test run with voltage, current, bearing condition, temperature condition and vibration check. 

 
       

Field Replace Motor :- Disconnect all the cable, Recheck alignment, Disconnect coupling, Remove motor from base plate, Re-install spare motor, Connect all the cable, Rotating check, Shaft laser alignment, Motor on-load and on-load test run with voltage, current, bearing  condition, temperature condition and vibration check.

Field Service for Splitted Case Pump :- Disconnect universal coupling, Dismantle pump, Remove impeller to repair in CHU workshop, Impeller reinstallation, replace all gasket, Assemble pump, Connect  universal coupling, Test run with temperature, bearing condition, vibration check.

 


  • Ceramic Epoxy02.JPG
    Workscope :Inspection, Cast iron or brass patching, Sand blast, surface cleaing with safety chemical, Epoxy silicon carbide putty & patching, Ceramic polymer carbide coating, D...

  • Service03.JPG
    Workscope of Service :- Oil Sampling : DGA, BDV., Acidity, Moisture Content :- Transformer Oil Reconditioned : Purify & Refill :- Replace Gasket, Bushing, Sili...
Visitors: 133,563